Get a Quote

buchanan jaw crusher type

The speed of jaw crushers varies inversely with the size, and usually lies in the range of 100350rpm. The main criterion in determining the optimum speed is that particles must be given sufficient time to move down the crusher throat into a new position before being nipped again

baking bread with and without a machine | fix.com

Cv = Breaking strength loss factorPp = Power at drive pulley in Newton.V = belt speed in m/sec.An Example of Conveyor Belt CalculationsInput data:Conveyor capacity (Cc) = 1500 t/h = 416.67 Kg/secBelt speed (V) = 1.5 m/secConveyor height (H) = 20 mConveyor length (L) = 250 mMass of a set of idlers (mi) = 20 KgIdler spacing (l) = 1.2 mLoad due to belt (mb) = 25 Kg/mInclination angle of the conveyor () = 5 0Coefficient of friction (f) = 0.02Start-up factor (Ks) = 1.5Drive efficiency (Kd) = 0.9Friction factor (Cr) = 15Breaking strength loss factor (Cv) = 0.75Calculation:First, we will use the eqn.1.2 for finding out the load due to idlers:mi = (20/1.2) = 16.67 Kg/mWe will use the eqn.1.1 for finding out the belt tension in steady state:Tb = 1.37*0.02*250*9.81*[16.67+ {2*25+ (416.67/1.5)}*cos (5)] + (20*9.81* (416.67/1.5)) = 77556.88 N.The belt tension while starting the system can be calculated by using the eqn.1.4:Tbs = 1.5 * 77556.88 = 116335.32 NFor calculating the power at drive pulley, we will use the eqn.1.3:Pp = (77556.88*1.5)/ 1000 = 116.335 KwWe will use the eqn.1.5 estimate the size of the motor:Pm = 116.35/0.9 = 129.261 KwWe will use the eqn.1.6 to find out the acceleration of the motor:A = (116335.32 - 77556.88)/ [250*{(2*16.67) + (2*25) + (416.67/1.5)}]= 0.429 m/sec2Lastly, we will use the eqn.1.7 to find out the belt breaking strength:Bs = (15*116.35) / (0.75*1.5) = 1551.33 N/mmThis Bs value is used to select the conveyor belt from the manufacturers catalogue.ConclusionThe conveyor belt calculations methodology discussed in the article is to be used only for the guidance on calculating the initial conveyor design parameters; the final design must be validated by using the FEA or other similar tools before building the prototype.ReferenceDunlop Conveyor belt technique design and calculationBridgestone Conveyor Belt Design Manual

baking bread with and without a machine | fix.com

small pe 400 600 mini jaw crusher machine-Jaw Crusher PE 400*600 for Sale New - usmvmcnd high manganese steel small jaw crusher(pe400 600) complete details about high manganese steel small jaw pe 400 600 stone jaw crusher machine mini jaw rock crusher Get Price And Support Online Jaw Crusher Small Jaw Crusher PE Jaw Crusher Mini Jaw Get price

Austenitic manganese steel was invented by Sir Robert Hadfield in 1882 and was first granted patented in Britain in 1883 with patent number 200. The first United States patents, numbers 303150 and 303151, were granted in 1884. In accordance with ASTM A128 specification, the basic chemical composition of Hadfield steel is 1%1.4% carbon and 11%14% manganese. However, the manganese to carbon ratio is optimum at 10:1 to ensure an austenitic microstructure after quenching [2]. Austenitic manganese steels possess unique resistance to impact and abrasion wears. They exhibit high levels of ductility and toughness, slow crack propagation rates, and a high rate of work-hardening resulting in superior wear resistance in comparison with other potentially competitive materials [310]. These unique properties have made Hadfield's austenitic manganese steel an engineering material of choice for use in heavy industries, such as earth moving, mining, quarrying, oil and gas drilling, and in processing of various materials for components of crushers, mills, and construction machinery (lining plates, hammers, jaws, cones)

The speed of jaw crushers varies inversely with the size, and usually lies in the range of 100350rpm. The main criterion in determining the optimum speed is that particles must be given sufficient time to move down the crusher throat into a new position before being nipped again

Cv = Breaking strength loss factorPp = Power at drive pulley in Newton.V = belt speed in m/sec.An Example of Conveyor Belt CalculationsInput data:Conveyor capacity (Cc) = 1500 t/h = 416.67 Kg/secBelt speed (V) = 1.5 m/secConveyor height (H) = 20 mConveyor length (L) = 250 mMass of a set of idlers (mi) = 20 KgIdler spacing (l) = 1.2 mLoad due to belt (mb) = 25 Kg/mInclination angle of the conveyor () = 5 0Coefficient of friction (f) = 0.02Start-up factor (Ks) = 1.5Drive efficiency (Kd) = 0.9Friction factor (Cr) = 15Breaking strength loss factor (Cv) = 0.75Calculation:First, we will use the eqn.1.2 for finding out the load due to idlers:mi = (20/1.2) = 16.67 Kg/mWe will use the eqn.1.1 for finding out the belt tension in steady state:Tb = 1.37*0.02*250*9.81*[16.67+ {2*25+ (416.67/1.5)}*cos (5)] + (20*9.81* (416.67/1.5)) = 77556.88 N.The belt tension while starting the system can be calculated by using the eqn.1.4:Tbs = 1.5 * 77556.88 = 116335.32 NFor calculating the power at drive pulley, we will use the eqn.1.3:Pp = (77556.88*1.5)/ 1000 = 116.335 KwWe will use the eqn.1.5 estimate the size of the motor:Pm = 116.35/0.9 = 129.261 KwWe will use the eqn.1.6 to find out the acceleration of the motor:A = (116335.32 - 77556.88)/ [250*{(2*16.67) + (2*25) + (416.67/1.5)}]= 0.429 m/sec2Lastly, we will use the eqn.1.7 to find out the belt breaking strength:Bs = (15*116.35) / (0.75*1.5) = 1551.33 N/mmThis Bs value is used to select the conveyor belt from the manufacturers catalogue.ConclusionThe conveyor belt calculations methodology discussed in the article is to be used only for the guidance on calculating the initial conveyor design parameters; the final design must be validated by using the FEA or other similar tools before building the prototype.ReferenceDunlop Conveyor belt technique design and calculationBridgestone Conveyor Belt Design Manual

spesifikasi mesin crusher batu bara

Mar 20 There are more than gold mining sites in Sudan About 60 gold processing companies are operating in 13 states of the country Tailings from mines Mineral processing Specific commodities estimated that every week between 50 and 100

spesifikasi mesin crusher batu bara

Supporting your mining operations, from plant design expertise to equipment, parts and services for every stage of your process

Egypt Stone, Egypt Stone Company Mining, crushers and supply of raw 27 Mar 2016 It is not clear whether copper or gold mining started first in Egypt; most

Iron ore crusher machine is for mine mining iron ore crushing and independent research and development of the crushing equipment Iron is the world's most commonly used metal steel of which iron ore is the key ingredient representing almost 95% of iron ore mining machinery price Get price >>

Jiji.co.ke More than 7 Grinding Machines for sale Starting from KSh 350 in Kenya choose Energy-saving Ball Mill Gold Mine Grinding Equipment Ball Mill Price Which Manufacturing Equipment belong to the premium segment?

Impact crusher: Feed particle size: 800mm Processing capacity: 30800t/h Features: The structural design is unique, the controlability and flexibility are strong, the discharged particle size can be adjusted reasonably, the grain shape of finished product is better, and the comprehensive economic benefit is

Mar 20 There are more than gold mining sites in Sudan About 60 gold processing companies are operating in 13 states of the country Tailings from mines Mineral processing Specific commodities estimated that every week between 50 and 100

separation line
Blog Posts

Looking for a reliable & stable mining machinery partner?

Get A Quote